Live
Video
Embed Code

Photo Gallery: Inside Taking Shape at Indoor Track and...
7/23/2012


Previous Gallery: NDSU Football Media Day (Aug....
Next Gallery: Amy Anderson World University...
-
426
640
Indoor Track Construction
An opening above the main entrance of the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767388
Ryan Perreault
426
640
Indoor Track Construction
Light fixtures and an overhead door opening on the northeast side of the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767386
Ryan Perreault
426
640
Indoor Track Construction
A light fixture and space for signage on the east side of the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767387
Ryan Perreault
426
640
Indoor Track Construction
Workers build walls around the ticket window and concession stand inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767383
Ryan Perreault
640
438
Indoor Track Construction
Plumbing fixtures in the wall of a private restroom in the lobby of the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767400
Ryan Perreault
-
426
640
Indoor Track Construction
Plumbing fixtures in the wall of one of the public restrooms inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767395
Ryan Perreault
426
640
Indoor Track Construction
Plumbing fixtures in the wall of one of the public restrooms inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767396
Ryan Perreault
432
640
Indoor Track Construction
Concrete dries as workers level and pack the sand floor and hang insulation inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767384
Ryan Perreault
426
640
Indoor Track Construction
Concrete dries inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767401
Ryan Perreault
432
640
Indoor Track Construction
Workers hang insulation on the southwest corner wall inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767389
Ryan Perreault
-
426
640
Indoor Track Construction
A worker levels and packs sand on the floor of the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767398
Ryan Perreault
426
640
Indoor Track Construction
Workers lay a yellow barrier over the sand floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767402
Ryan Perreault
426
640
Indoor Track Construction
Two sand pits for jumping events are poured level with the competition floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767391
Ryan Perreault
426
640
Indoor Track Construction
Two sand pits for jumping pits are poured level with the competition floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767390
Ryan Perreault
426
640
Indoor Track Construction
Conduit for a future scoreboard runs up the north and south walls of the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767399
Ryan Perreault
-
426
640
Indoor Track Construction
Framing for an overhead door that will separate the storage area from the competition floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767394
Ryan Perreault
426
640
Indoor Track Construction
Air handlers are installed in the northeast corner storage area inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767381
Ryan Perreault
640
426
Indoor Track Construction
An electrical panel in the northeast corner of the Shelly Ellig indoor track and field facility Monday, July 23, 2012.
206767382
Ryan Perreault
1/22




